GAE University

Celso Arturo Salvador Ricra

From mine planning to integrated operations management

A career in Latin American mining connecting engineering decisions, production and business management.

Education
Mining Engineering · UNI
Master’s degree in Administration · ESAN
Current role
Corporate Technical Manager · Atico Mining

Previous experience · Nyrstar · Milpo · Minera Bateas · Volcan

  • Mining and metallurgical operations
  • Mine planning and development
  • Capacity expansion and operational improvement
Celso Arturo Salvador Ricra
  • 40+ years
    A career in the mining industry

    From mine planning to operations leadership and corporate technical management.

  • Peru · Colombia · Ecuador
    Regional mining experience

    Mining operations and project engineering across three Latin American countries.

  • Mina + planta
    Integrated management

    Operations, technical services and support.

  • UNI · ESAN
    Engineering and management

    Education in mining engineering and administration.

Engineering and management from the operation

Celso Arturo Salvador Ricra is a mining engineer with postgraduate education in administration and a career spanning planning, operations leadership and corporate technical management. His experience covers underground and open-pit mining, with responsibility for mine, plant and support activities.

Read full professional biography

Celso Arturo Salvador Ricra is a mining engineer from Universidad Nacional de Ingeniería with master’s-level education in Administration at ESAN. His professional career began in 1984 and spans mine planning, project development, operations leadership and corporate technical management. He has worked in underground and open-pit mining, connecting decisions about mines, plants, infrastructure, equipment and business organization.

He currently serves as Corporate Technical Manager at Atico Mining Corporation, a role held since October 2016. His experience encompasses the El Roble operation in Colombia and engineering for the La Plata project in Ecuador. His contributions include improved recovery of mine reserves, mechanized ground support, filtered tailings and SAG milling, linking resource utilization with operational capacity and continuity.

Before Atico, he was General Manager at Nyrstar Áncash, responsible for the Contonga, Pucarajo and Coricancha mining and metallurgical operations. His work addressed cost reduction, processing capacity, hydraulic backfill and tailings storage. As Project Manager at Antioquia Gold, he worked on preparation of a Colombian gold development, including access and infrastructure decisions. At Milpo, he managed Cerro Lindo operations, coordinating mine, plant and support functions during production growth and operational improvement.

His Colombian experience also includes serving as General Manager of Continental Gold, where he led organizational development for a gold operation and integrated technical services, administration, sustainability and industrial safety. At Suyamarca, he served as Planning Superintendent, covering mine, plant and support planning at Pallancata.

At Minera Bateas in Caylloma, he was Operations Manager in 2006–2007 and General Manager in 2008–2011. His work included operational start-up, mine preparation and expansion, plant expansion and development of narrow silver veins. Responsibilities extended to exploration, service infrastructure, tailings storage and concentrate marketing, connecting business leadership with practical decisions about growth and operational continuity.

He built his early career at Centromin Perú and Volcan. At Centromin he progressed from Planning Assistant to Mine Planning Engineer and Open-pit Superintendent, working on production scheduling, ventilation, haulage, drilling and blasting, access and investment. At Volcan he held open-pit and general superintendent responsibilities, addressing mining methods, plant reliability, investment plans and acid-water treatment.

Alongside his industry career, he taught part-time at Universidad Nacional Daniel Alcides Carrión and Universidad Nacional de Ingeniería. His teaching covered mine design, surface mining methods, drilling and blasting, and mine administration. This experience connects technical explanation with the decisions required to produce, develop operations and coordinate teams under real operating conditions.

Meet Celso

An introduction to his industry experience and its connection with applied learning.

Introduction video · 45–60 secondsDesign placeholder. Participation, recording and approval pending.

Leadership experience in industry

Current role

Atico Mining Corporation

October 2016 – present

  • Corporate Technical Manager

His role integrates technical management at El Roble, Colombia, and engineering for the La Plata project, Ecuador, linking mine, process and infrastructure decisions.

Contributions and selected experience

  • Mine reserve recovery increased from 86% to 95%.
  • Mechanized ground support and filtered-tailings storage.
  • SAG milling implementation and La Plata project engineering.

Nyrstar Áncash

2015 – September 2016

  • General Manager

Managed mining and metallurgical operations at Contonga, Pucarajo and Coricancha. His work addressed cost reduction, processing capacity, hydraulic backfill and tailings storage.

Contributions and selected experience

  • Reduced operating and administrative costs.
  • Increased processing capacity at Contonga.
  • Hydraulic backfill and expanded storage at Tucush tailings facility.

Antioquia Gold

August 2014 – April 2015

  • Project Manager

Worked on the development of a gold project in Antioquia, Colombia, including preparation, access and infrastructure. The revised design delivered savings against the original plan from a revised access design for Guayco.

Contributions and selected experience

  • Revised Guayco access design with USD 1 million in savings against the original plan.
  • Infrastructure preparation for reserve development and mining start-up.

Milpo · Unidad Minera Cerro Lindo

June 2013 – June 2014

  • Operations Manager

Managed mine, plant and support activities. His work included increased production through an additional mill and improved use of mine equipment, together with changes in blasting and operational safety.

Contributions and selected experience

  • Production increased from 16,000 to 17,000 tonnes per day through an additional mill and greater use of mine equipment.
  • Improved fragmentation and blasting times using dual non-electric delays.
  • Direct safety leadership and infrastructure adjustments to operational needs.

Continental Gold · Colombia

April 2012 – May 2013

  • General Manager

Led organizational development for a gold operation, bringing together technical services, administration, sustainability and industrial safety.

Contributions and selected experience

  • Organized technical services, administration, sustainability and safety for a developing gold operation.
  • Implemented common processes and procedures across operations, finance and logistics.

Compañía Minera Suyamarca

2012

  • Planning Superintendent

Responsible for planning mine, plant and support operations at Pallancata, connecting production requirements with technical services.

Contributions and selected experience

  • Mine, plant and support planning at Pallancata.
  • Coordination of mine planning, short-term planning, geomechanics and civil works.

Minera Bateas · Caylloma

August 2006 – December 2011

  • Operations Manager / General Manager

Served as Operations Manager in 2006–2007 and General Manager in 2008–2011. His work included operational start-up, mine development, plant expansion, exploration and concentrate marketing.

Contributions and selected experience

  • Operations started in October 2006.
  • Mine capacity developed from 500 to 1,300 tonnes per day; plant capacity expanded from 600 to 1,200 tonnes per day.
  • Exploration and development of narrow silver veins; concentrate marketing negotiations in 2009.

Volcan Compañía Minera

1999 – 2006

  • Open-pit Superintendent / General Superintendent

Served in open-pit and general superintendent roles with responsibility for the unit’s mining and metallurgical operations and coordination of technical areas.

Contributions and selected experience

  • Implemented long-hole underground mining and a new open-pit production front.
  • Medium- and long-term investment plans and improved plant reliability.
  • Strengthened acid-water treatment and community relationships.

Centromin Perú

1984 – 1999

  • Mine planning and open-pit supervision

Progressed from Planning Assistant to Mine Planning Engineer and Open-pit Superintendent. His work included work on drilling and blasting, operating and investment plans, and access development.

Contributions and selected experience

  • Mine planning, haulage, ventilation and investment projects.
  • Mine expansion from 55,000 to 70,000 tonnes per month through coordinated work with operations.
  • Revised access planning with USD 1 million in savings and a six-month reduction in execution time.

Experience connecting engineering and management

Atico Mining · El Roble / La Plata

Technical management across operation and project

ContextReserve recovery improvement, mechanized ground support, filtered tailings, SAG milling and La Plata engineering.

His responsibilityCorporate Technical Manager since October 2016.

Learning connectionRelate mining, infrastructure and processing decisions to overall operational performance.

86 % → 95 %Mine reserve recovery
El Roble · La PlataOperation and project engineering

Minera Bateas · Caylloma

Operational start-up and capacity expansion

ContextOperational start-up in 2006, mine and plant expansion, and development of narrow silver veins.

His responsibilityOperations Manager and subsequently General Manager during 2006–2011.

Learning connectionExamine how planning, mine preparation and plant capacity must progress together.

Milpo · Cerro Lindo

Coordinating mine and plant growth

The challengeIncrease production in an underground polymetallic operation while coordinating plant capacity, equipment use and mine services.

His responsibilityOperations Manager from June 2013 to June 2014, responsible for mine, plant and support activities.

Applied experienceProduction increased from 16,000 to 17,000 tonnes per day through an additional mill and increased use of mine equipment.

The capacities and results described relate to historical operating periods and the work of their teams.

Areas of expertise

  • Mine planning

    Scheduling, mine development and investment projects.

  • Integrated operations

    Coordination of mine, plant and support services.

  • Capacity expansion

    Mine preparation, plant circuits and equipment use.

  • Drilling and blasting

    Fragmentation, mining methods and operational performance.

  • Tailings and infrastructure

    Documented experience in filtered tailings, storage and backfill.

  • Mining business management

    Budgets, organization, marketing and team leadership.

Education and teaching experience

Mining Engineer

Universidad Nacional de Ingeniería · 1977–1983

Master’s degree in Administration

ESAN · 1993–1994

Teaching experience

  • Universidad Nacional Daniel Alcides Carrión · 1995–2004Mine design, surface mining methods, drilling and blasting.
  • Universidad Nacional de Ingeniería · 2008–2011Surface mining methods and mine administration.

Additional education: master’s studies in Business Administration at UCV, in progress since 2025.

Learning from decisions made in real mining operations

His career connects planning, production and operations leadership with the questions mining professionals face.

A perspective developed across mines, plants and business management, with operational experience in Peru and Colombia.

  • Mine and plant growth

    How can mine growth be coordinated with plant processing capacity?

  • Planning and operational continuity

    Which planning decisions support operational continuity?

  • Investment decisions

    How can a technical improvement be prioritized alongside capacity, costs and infrastructure?

  • Safety and productivity

    How can drilling, blasting and mine services be integrated with safety and production objectives?

  • Integrated operations management

    How can mine, plant, maintenance and support functions respond to the same operational need?

  • Team leadership

    How can a production plan be translated into responsibilities, resources and daily follow-up?

Related graduate program

His experience relates closely to the themes of the program below.

Back to Faculty

MSc in Extractive Industries Management

Integrated management of extractive operations: planning, sustainability, safety and technical leadership for modern mining.

Explore the program